Overview

The brief.

A health SaaS had an SOC2 audit booked before evidence existed. We mapped 85 controls to engineering and generated evidence as they built, passing Type II on the first attempt.

Client

Health SaaS

Healthcare / B2B SaaS

Series B

Gallery

In the wild.

Evidence portal grayscale
Control mapping matrix grayscale
Risk register grayscale
Auditor readout deck grayscale

Slide 1 of 1

The numbers.

Results

  • First attempt

    SOC2 Type II

  • 100%

    criticals closed

  • 85

    controls mapped

  • 8 weeks

    to evidence-ready

The challenge

What was in the way.

Audit booked, no evidence

Enterprise deals required SOC2, and the audit was already scheduled. But evidence lived in screenshots and tribal knowledge - there was no systematic trail.

Controls as paperwork

Security controls were a checklist on the wall, not wired into engineering. Nothing enforced them, so drift was invisible until the auditor asked.

The solution

How we solved it.

We ran a threat model, mapped 85 controls to SOC2, and made evidence a build artifact: DefectDojo for vulns, OpenTofu baselines for config, OpenBao for secrets, and nightly ZAP/OSV scans feeding an evidence pack per control.

“We passed first attempt. The auditor kept saying the evidence was the cleanest they'd seen - because it was generated, not assembled.”

CTO

Chief Technology Officer · health SaaS

Outcome

The bottom line.

First attemptSOC2 Type II

Passed SOC2 Type II first attempt - evidence generated as we built, not before the audit.

FAQ

About this engagement.

How did you pass first attempt?

Evidence was generated by the pipeline per control, so nothing was missing at audit time.

How long to evidence-ready?

8 weeks for evidence; the auditor's own timeline is separate.

Is it sustainable?

Yes - evidence regenerates nightly; no re-assembling before each audit.

Want results like these?

We build to the outcome, then let the numbers speak.